|
|
|
|
|||||||||||||||||||||||
Project Description
PCL Constructors Northern Inc. was awarded the construction management of the new Correctional Centre in Yellowknife, The project provided the team with many challenges. The site chosen is an old rock quarry site with the buildings situated on blasted rock surfaces. Concrete walls are scribed and doweled to the rock surface. The topography dictates floor elevations and layout. The layout of the building provided challenges in maintaining heat during cold weather construction. The facility is operated on an indirect supervision approach and focuses on the healing and program aspect of rehabilitation rather than the standard institutional approach of 'locking them up.' Construction materials are more subdued creating a quiet and peaceful environment.
|
Contact
For similar projects contact:OwnerPrime Consultant |
| Site Design and Build by Impello Inc. | Copyright © 2005 PCL Constructors Inc. All rights reserved. |
| Our operations are carried out by a number of independent companies which operate in different construction markets and geographic areas. |